Altronix VertiLine8i Installation Instructions Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Accessoires pour les appareils électriques Altronix VertiLine8i Installation Instructions. Altronix VertiLine8i Installation Instructions User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
CCTV Isolated Rack Mount
Power Supplies
Installation Guide
Models Include:
Vertiline8i Vertiline8Di
- 24VAC or 28VAC @ 8 amp - 24VAC or 28VAC @ 8 amp
- Eight (8) fuse protected electronically - Eight (8) PTC protected electronically
isolated outputs isolated outputs
Vertiline16i Vertiline16Di
- 24VAC or 28VAC @ 16 amp - 24VAC or 28VAC @ 16 amp
- Sixteen (16) fuse protected electronically - Sixteen (16) PTC protected electronically
isolated outputs isolated outputs
Rev. 031808
More than just power.
TM
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1 - Installation Guide

CCTV Isolated Rack Mount Power SuppliesInstallation GuideModels Include:Vertiline8i Vertiline8Di- 24VAC or 28VAC @ 8 amp - 24VAC or 28VAC @ 8 amp- Eig

Page 2 - Installation Instructions:

- 2 - Vertiline8i/Vertiline16iOverview:Altronix Vertiline AC Isolated CCTV Rack Mount Power Supplies provide 8 or 16 camera channels in a space saving

Page 3

Vertiline8i/Vertiline16i - 3 -9. Connect the power outputs of terminals marked [1P & 1N] to the power inputs of camera 1 (Fig. 2, pg. 5).Repeat th

Page 4 - 115VAC 220VAC

- 4 - Vertiline8i/Vertiline16i28VACOFF24VAC123 4 567 8 9 10 11 12 13 14 15 1628VACOFF24VACOFFRESETAC POWER13141516NPNPNPNP9101112NPNPNPNP5678NPNPNPNP1

Page 5 - Typical Hookup:

Vertiline8i/Vertiline16i - 5 -Fig. 228VACOFF24VAC123 4 567 8 9 10 11 12 13 14 15 1628VACOFF24VACOFFRESETAC POWER13141516NPNPNPNP9101112NPNPNPNP5678NPN

Page 6 - TOP & BOTTOM

- 6 - Vertiline8i/Vertiline16i1.625" 8.5" .75" 19.125" 17.625" (ON) AC POWER13141516NPNPNPNP9101112NPNPNPNP5678NPNPNPNP1234NP

Page 7 - Mounting Hardware (Included):

Vertiline8i/Vertiline16i - 7 -Mounting Options:Fig. 4Wall Mount Installation1- Install mounting brackets (A) on the left and right side of rack chass

Page 8

- 8 - Vertiline8i/Vertiline16iMEMBERAltronix is not responsible for any typographical errors.Altronix Corp.140 58th Street, Brooklyn, New York 11220 U

Commentaires sur ces manuels

Pas de commentaire